Mining and quarrying, value added in Niger

Niger: Mining and quarrying, value added was 171.20 million current US$ in 2003. ◆ Volatile

Latest (2003)
171.20 million current US$
Change on year
up 24.8%
World rank
30th
of 50 countries
All-time high
318.54 million current US$
in 1980
All-time low
246,300 current US$
in 1970
Years of data
36
1968–2003

Mining and quarrying, value added in Niger, 1968–2003

0100.0M200.0M300.0M1968198520031968: 277.1k current US$1969: 263.4k current US$1970: 246.3k current US$1971: 3.0M current US$1972: 4.1M current US$1973: 4.6M current US$1974: 7.1M current US$1975: 29.0M current US$1976: 41.2M current US$1977: 64.6M current US$1978: 109.1M current US$1979: 196.1M current US$1980: 318.5M current US$1981: 192.8M current US$1982: 148.5M current US$1983: 149.1M current US$1984: 120.6M current US$1985: 116.4M current US$1986: 134.9M current US$1987: 159.1M current US$1988: 148.1M current US$1989: 133.5M current US$1990: 131.1M current US$1991: 158.5M current US$1992: 171.1M current US$1993: 115.9M current US$1994: 108.8M current US$1995: 129.2M current US$1996: 145.4M current US$1997: 134.3M current US$1998: 140.7M current US$1999: 135.8M current US$2000: 122.9M current US$2001: 125.0M current US$2002: 137.2M current US$2003: 171.2M current US$

Source: World Bank national accounts data, and OECD National Accounts data files. Measured in current US$.

Analysis

The most recent figure for mining and quarrying, value added in Niger is 171.20 million current US$, measured in 2003.

The figure is up 24.8% on the previous year and up 47.7% over ten years.

Over the whole period, mining and quarrying, value added in Niger peaked at 318.54 million current US$ in 1980 and was at its lowest, 246,300 current US$, in 1970.

That places Niger 30th out of 50 countries with data for 2003, putting it in the middle of the range.

The series is highly variable year to year, so single readings are best treated with caution.

Mining and quarrying, value added in Niger, year by year

Annual values for Mining and quarrying, value added (current US$) in Niger, 1968 to 2003.
Year current US$ Change
1968 277,088 current US$
1969 263,371 current US$ -5.0%
1970 246,300 current US$ -6.5%
1971 2.96 million current US$ +1102.5%
1972 4.06 million current US$ +37.2%
1973 4.60 million current US$ +13.3%
1974 7.10 million current US$ +54.3%
1975 29.04 million current US$ +308.8%
1976 41.22 million current US$ +41.9%
1977 64.59 million current US$ +56.7%
1978 109.12 million current US$ +68.9%
1979 196.14 million current US$ +79.7%
1980 318.54 million current US$ +62.4%
1981 192.84 million current US$ -39.5%
1982 148.51 million current US$ -23.0%
1983 149.06 million current US$ +0.4%
1984 120.61 million current US$ -19.1%
1985 116.41 million current US$ -3.5%
1986 134.85 million current US$ +15.8%
1987 159.05 million current US$ +17.9%
1988 148.06 million current US$ -6.9%
1989 133.54 million current US$ -9.8%
1990 131.12 million current US$ -1.8%
1991 158.45 million current US$ +20.8%
1992 171.14 million current US$ +8.0%
1993 115.91 million current US$ -32.3%
1994 108.79 million current US$ -6.1%
1995 129.22 million current US$ +18.8%
1996 145.44 million current US$ +12.6%
1997 134.32 million current US$ -7.6%
1998 140.69 million current US$ +4.7%
1999 135.78 million current US$ -3.5%
2000 122.90 million current US$ -9.5%
2001 124.96 million current US$ +1.7%
2002 137.16 million current US$ +9.8%
2003 171.20 million current US$ +24.8%

Niger compared with similar countries

  • Niger's 171.20 million current US$ is above the median for low income countries, which is 119.91 million current US$, 1.4× the median. (18 countries reporting)
  • Niger's 171.20 million current US$ is below the median for Sub-Saharan Africa, which is 348.41 million current US$, 49% of the median. (44 countries reporting)

Biggest year-on-year movements

Years where Mining and quarrying, value added in Niger changed far more than this series normally does. A large move can be a real event or a change in how the figure was measured — the source note below says who published it.

YearChange FromTo
1971 +1102.5% 246,300 current US$ 2.96 million current US$
1975 +308.8% 7.10 million current US$ 29.04 million current US$

Averages by decade

DecadeAverage LowestHighest Years
1960s 270,230 current US$ 263,371 current US$ 277,088 current US$ 2
1970s 45.91 million current US$ 246,300 current US$ 196.14 million current US$ 10
1980s 162.15 million current US$ 116.41 million current US$ 318.54 million current US$ 10
1990s 137.09 million current US$ 108.79 million current US$ 171.14 million current US$ 10
2000s 139.05 million current US$ 122.90 million current US$ 171.20 million current US$ 4

Countries ranked near Niger

  1. 27 Tunisia 351.76 million current US$ compare
  2. 28 Kenya 232.19 million current US$ compare
  3. 29 Lesotho 222.33 million current US$ compare
  4. 31 Senegal 168.81 million current US$ compare
  5. 32 Malawi 143.23 million current US$ compare
  6. 33 Sierra Leone 124.99 million current US$ compare

See the full ranking of 53 places →

More economy & growth data for Niger

All data for Niger →

Frequently asked questions

What is mining and quarrying, value added in Niger?
Mining and quarrying, value added in Niger was 171.20 million current US$ in 2003, according to World Bank national accounts data, and OECD National Accounts data files.
What is the highest mining and quarrying, value added recorded in Niger?
The highest recorded value was 318.54 million current US$ in 1980.
What is the lowest mining and quarrying, value added recorded in Niger?
The lowest recorded value was 246,300 current US$ in 1970.
How does Niger rank for mining and quarrying, value added?
Niger ranks 30th out of 50 countries with data for 2003.
Is mining and quarrying, value added rising or falling in Niger?
Over the last ten years it is up 47.7%. The long-run trend across the full record is volatile.
Where does this Niger data come from?
The figures come from World Bank national accounts data, and OECD National Accounts data files, published as part of Mining and quarrying, value added (current US$). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 36 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Mining and quarrying, value added in Niger. Statizoid, drawing on World Bank national accounts data, and OECD National Accounts data files. Retrieved 23 September 2026, from https://economy.statizoid.com/stat/mining-and-quarrying-value-added-current-us/niger/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://economy.statizoid.com/stat/mining-and-quarrying-value-added-current-us/niger/">Mining and quarrying, value added in Niger</a> — Statizoid

About this data

Indicator
Mining and quarrying, value added (current US$)
Unit
current US$
Source
World Bank national accounts data, and OECD National Accounts data files
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
53 places, 1,780 data points, 1965–2011
Last refreshed

Value added in mining and quarrying is defined as the value of output of the mining and quarrying industries less the value of intermediate consumption (intermediate inputs). Mining and quarrying is a subset of industry (ISIC 10-14). Data are in current U.S. dollars.