Africa Eastern and Southern vs Spain: Industry (including construction), value added per worker

Africa Eastern and Southern
10,679 constant 2015 US$
in 2025
Spain
61,432 constant 2015 US$
in 2025
Africa Eastern and Southern rank
30th
Spain rank
31st

Industry (including construction), value added per worker over time

  • Africa Eastern and Southern
  • Spain
020.0k40.0k60.0k199120082025

How they compare

Spain currently reports 61,432 constant 2015 US$ against 10,679 constant 2015 US$ in Africa Eastern and Southern, a difference of 50,753 constant 2015 US$.

That makes Spain's figure about 5.8 times Africa Eastern and Southern's.

Across all 31 years both countries report, Spain has been ahead every year.

Africa Eastern and Southern ranks 30th and Spain ranks 31st of 44 groups.

Spain has averaged higher in every one of the 4 decades both report.

Head to head by decade

Decade Africa Eastern and Southern Spain Difference Ahead
1990s 7,525 constant 2015 US$ 57,822 constant 2015 US$ 50,297 constant 2015 US$ Spain
2000s 8,796 constant 2015 US$ 55,509 constant 2015 US$ 46,713 constant 2015 US$ Spain
2010s 10,556 constant 2015 US$ 66,173 constant 2015 US$ 55,617 constant 2015 US$ Spain
2020s 10,594 constant 2015 US$ 60,099 constant 2015 US$ 49,505 constant 2015 US$ Spain

Averages of every year both report within each decade.

Frequently asked questions

Which has higher industry (including construction), value added per worker, Africa Eastern and Southern or Spain?
Spain, at 61,432 constant 2015 US$ against 10,679 constant 2015 US$ in Africa Eastern and Southern as of 2025.
What is the difference in industry (including construction), value added per worker between Africa Eastern and Southern and Spain?
50,753 constant 2015 US$, with Spain ahead.
How many years of comparable data are there for Africa Eastern and Southern and Spain?
31 years are reported by both, from 1995 to 2025.
How do Africa Eastern and Southern and Spain rank globally for industry (including construction), value added per worker?
Africa Eastern and Southern ranks 30th and Spain ranks 31st of 44 groups.
Where does this data come from?
World Development Indicators database, World Bank (WB), published as Industry (including construction), value added per worker (constant 2015 US$). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Africa Eastern and Southern vs Spain: Industry (including construction), value added per worker. Statizoid, drawing on World Development Indicators database, World Bank (WB). Retrieved 28 August 2026, from https://economy.statizoid.com/compare/industry-including-construction-value-added-per-worker-constant-2015-us/africa-eastern-and-southern/spain/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://economy.statizoid.com/compare/industry-including-construction-value-added-per-worker-constant-2015-us/africa-eastern-and-southern/spain/">Africa Eastern and Southern vs Spain: Industry (including construction), value added per worker</a> — Statizoid

About this data

Indicator
Industry (including construction), value added per worker (constant 2015 US$)
Unit
constant 2015 US$
Source
World Development Indicators database, World Bank (WB)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
222 places, 7,148 data points, 1991–2025
Last refreshed

Industry (including construction) corresponds to ISIC (Rev.4) divisions 05-43. It is comprised of mining, manufacturing, construction, electricity, water, and gas industries. Value added is the contribution to the economy by a producer or an industry or an institutional sector, which is estimated by the total value of output produced and deducting the total value of intermediate consumption of goods and services used to produce that output. The core indicator has been divided by the number of workers in this sector to derive a measure of labor productivity. This indicator is expressed in constant prices, meaning the series has been adjusted to account for price changes over time. The reference year for this adjustment is 2015. This indicator is expressed in United States dollars.