Cyprus vs Kuwait: Hydropower generation by region

Cyprus
0 terawatt-hours
in 1999
Kuwait
0 terawatt-hours
in 1999
Cyprus rank
71st
Kuwait rank
71st

Hydropower generation by region over time

  • Cyprus
  • Kuwait
00.20.40.60.81196519821999

How they compare

Cyprus currently reports 0 terawatt-hours against 0 terawatt-hours in Kuwait, a difference of 0 terawatt-hours.

Across all 35 years both countries report, Kuwait has been ahead every year.

Cyprus ranks 71st and Kuwait ranks 71st of 79 countries.

Head to head by decade

Decade Cyprus Kuwait Difference Ahead
1960s 0 terawatt-hours 0 terawatt-hours 0 terawatt-hours β€”
1970s 0 terawatt-hours 0 terawatt-hours 0 terawatt-hours β€”
1980s 0 terawatt-hours 0 terawatt-hours 0 terawatt-hours β€”
1990s 0 terawatt-hours 0 terawatt-hours 0 terawatt-hours β€”

Averages of every year both report within each decade.

Frequently asked questions

Which has higher hydropower generation by region, Cyprus or Kuwait?
Cyprus, at 0 terawatt-hours against 0 terawatt-hours in Kuwait as of 1999.
What is the difference in hydropower generation by region between Cyprus and Kuwait?
0 terawatt-hours, with Cyprus ahead.
How many years of comparable data are there for Cyprus and Kuwait?
35 years are reported by both, from 1965 to 1999.
How do Cyprus and Kuwait rank globally for hydropower generation by region?
Cyprus ranks 71st and Kuwait ranks 71st of 79 countries.
Where does this data come from?
Energy Institute - Statistical Review of World Energy (2026) – with major processing by Our World in Data, published as Hydropower generation by region. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Hydropower generation by region
Unit
terawatt-hours
Source
Energy Institute - Statistical Review of World Energy (2026) – with major processing by Our World in Data
Licence
CC BY 4.0 (Our World in Data)
Coverage
82 places, 4,425 data points, 1965–2025
Last refreshed

Figures are based on gross primary hydroelectric generation and do not account for cross-border electricity supply.