Gabon vs Kenya: Electricity, gas and water supply, value added

Gabon
223.33 million current US$
in 2011
Kenya
293.56 million current US$
in 2011
Gabon rank
21st
Kenya rank
19th

Electricity, gas and water supply, value added over time

  • Gabon
  • Kenya
0200.0M400.0M600.0M196519882011

How they compare

Kenya currently reports 293.56 million current US$ against 223.33 million current US$ in Gabon, a difference of 70.23 million current US$.

That makes Kenya's figure about 1.3 times Gabon's.

The two have swapped places 4 times across 33 shared years of data; in 1970 it was Kenya ahead.

Gabon ranks 21st and Kenya ranks 19th of 52 countries.

Kenya has averaged higher in every one of the 5 decades both report.

Head to head by decade

Decade Gabon Kenya Difference Ahead
1970s 4.70 million current US$ 33.49 million current US$ 28.78 million current US$ Kenya
1980s 79.05 million current US$ 95.86 million current US$ 16.82 million current US$ Kenya
1990s 80.90 million current US$ 160.55 million current US$ 79.66 million current US$ Kenya
2000s 108.28 million current US$ 373.55 million current US$ 265.27 million current US$ Kenya
2010s 206.27 million current US$ 371.38 million current US$ 165.12 million current US$ Kenya

Averages of every year both report within each decade.

Frequently asked questions

Which has higher electricity, gas and water supply, value added, Gabon or Kenya?
Kenya, at 293.56 million current US$ against 223.33 million current US$ in Gabon as of 2011.
What is the difference in electricity, gas and water supply, value added between Gabon and Kenya?
70.23 million current US$, with Kenya ahead.
How many years of comparable data are there for Gabon and Kenya?
33 years are reported by both, from 1970 to 2011.
How do Gabon and Kenya rank globally for electricity, gas and water supply, value added?
Gabon ranks 21st and Kenya ranks 19th of 52 countries.
Where does this data come from?
World Bank national accounts data, and OECD National Accounts data files, published as Electricity, gas and water supply, value added (current US$). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Gabon vs Kenya: Electricity, gas and water supply, value added. Statizoid, drawing on World Bank national accounts data, and OECD National Accounts data files. Retrieved 30 August 2026, from https://economy.statizoid.com/compare/electricity-gas-and-water-supply-value-added-current-us/gabon/kenya/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://economy.statizoid.com/compare/electricity-gas-and-water-supply-value-added-current-us/gabon/kenya/">Gabon vs Kenya: Electricity, gas and water supply, value added</a> — Statizoid

About this data

Indicator
Electricity, gas and water supply, value added (current US$)
Unit
current US$
Source
World Bank national accounts data, and OECD National Accounts data files
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
53 places, 1,608 data points, 1965–2011
Last refreshed

Value added in gas, electricity and water is defined as the value of output of the ‘Electricity, Gas and Water supply' industry less the value of intermediate consumption (intermediate inputs). Gas, electricity and water is a subset of industry (ISIC 40-41). Data are in current U.S. dollars.