Malawi vs Sao Tome and Principe: Electricity, gas and water supply, value added

Malawi
18.28 billion current LCU
in 2011
Sao Tome and Principe
22.20 billion current LCU
in 2006
Malawi rank
25th
Sao Tome and Principe rank
23rd

Electricity, gas and water supply, value added over time

  • Malawi
  • Sao Tome and Principe
05.0B10.0B15.0B20.0B196519882011

How they compare

Sao Tome and Principe currently reports 22.20 billion current LCU against 18.28 billion current LCU in Malawi, a difference of 3.92 billion current LCU.

That makes Sao Tome and Principe's figure about 1.2 times Malawi's.

Across all 5 years both countries report, Sao Tome and Principe has been ahead every year.

Malawi ranks 25th and Sao Tome and Principe ranks 23rd of 51 countries.

Sao Tome and Principe has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher electricity, gas and water supply, value added, Malawi or Sao Tome and Principe?
Sao Tome and Principe, at 22.20 billion current LCU against 18.28 billion current LCU in Malawi as of 2006.
What is the difference in electricity, gas and water supply, value added between Malawi and Sao Tome and Principe?
3.92 billion current LCU, with Sao Tome and Principe ahead.
How many years of comparable data are there for Malawi and Sao Tome and Principe?
5 years are reported by both, from 2001 to 2006.
How do Malawi and Sao Tome and Principe rank globally for electricity, gas and water supply, value added?
Malawi ranks 25th and Sao Tome and Principe ranks 23rd of 51 countries.
Where does this data come from?
World Bank national accounts data, and OECD National Accounts data files, published as Electricity, gas and water supply, value added (current LCU). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Malawi vs Sao Tome and Principe: Electricity, gas and water supply, value added. Statizoid, drawing on World Bank national accounts data, and OECD National Accounts data files. Retrieved 13 September 2026, from https://economy.statizoid.com/compare/electricity-gas-and-water-supply-value-added-current-lcu/malawi/sao-tome-and-principe/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://economy.statizoid.com/compare/electricity-gas-and-water-supply-value-added-current-lcu/malawi/sao-tome-and-principe/">Malawi vs Sao Tome and Principe: Electricity, gas and water supply, value added</a> — Statizoid

About this data

Indicator
Electricity, gas and water supply, value added (current LCU)
Unit
current LCU
Source
World Bank national accounts data, and OECD National Accounts data files
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
51 places, 1,560 data points, 1965–2011
Last refreshed

Value added in gas, electricity and water is defined as the value of output of the ‘Electricity, Gas and Water supply' industry less the value of intermediate consumption (intermediate inputs). Gas, electricity and water is a subset of industry (ISIC 40-41). Data are in current local currency.