Gabon vs Madagascar: Electricity, gas and water supply, value added

Gabon
105.38 billion current LCU
in 2011
Madagascar
173.90 billion current LCU
in 2009
Gabon rank
10th
Madagascar rank
7th

Electricity, gas and water supply, value added over time

  • Gabon
  • Madagascar
050.0B100.0B150.0B197019902011

How they compare

Madagascar currently reports 173.90 billion current LCU against 105.38 billion current LCU in Gabon, a difference of 68.52 billion current LCU.

That makes Madagascar's figure about 1.7 times Gabon's.

The two have swapped places 1 time across 26 shared years of data; in 1984 it was Gabon ahead.

Gabon ranks 10th and Madagascar ranks 7th of 51 countries.

Across the 3 decades both report, Gabon averaged higher in 2 and Madagascar in 1.

Head to head by decade

Decade Gabon Madagascar Difference Ahead
1980s 31.61 billion current LCU 6.53 billion current LCU 25.08 billion current LCU Gabon
1990s 33.31 billion current LCU 28.74 billion current LCU 4.57 billion current LCU Gabon
2000s 57.39 billion current LCU 107.98 billion current LCU 50.59 billion current LCU Madagascar

Averages of every year both report within each decade.

Frequently asked questions

Which has higher electricity, gas and water supply, value added, Gabon or Madagascar?
Madagascar, at 173.90 billion current LCU against 105.38 billion current LCU in Gabon as of 2009.
What is the difference in electricity, gas and water supply, value added between Gabon and Madagascar?
68.52 billion current LCU, with Madagascar ahead.
How many years of comparable data are there for Gabon and Madagascar?
26 years are reported by both, from 1984 to 2009.
How do Gabon and Madagascar rank globally for electricity, gas and water supply, value added?
Gabon ranks 10th and Madagascar ranks 7th of 51 countries.
Where does this data come from?
World Bank national accounts data, and OECD National Accounts data files, published as Electricity, gas and water supply, value added (current LCU). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Gabon vs Madagascar: Electricity, gas and water supply, value added. Statizoid, drawing on World Bank national accounts data, and OECD National Accounts data files. Retrieved 03 September 2026, from https://economy.statizoid.com/compare/electricity-gas-and-water-supply-value-added-current-lcu/gabon/madagascar/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://economy.statizoid.com/compare/electricity-gas-and-water-supply-value-added-current-lcu/gabon/madagascar/">Gabon vs Madagascar: Electricity, gas and water supply, value added</a> — Statizoid

About this data

Indicator
Electricity, gas and water supply, value added (current LCU)
Unit
current LCU
Source
World Bank national accounts data, and OECD National Accounts data files
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
51 places, 1,560 data points, 1965–2011
Last refreshed

Value added in gas, electricity and water is defined as the value of output of the ‘Electricity, Gas and Water supply' industry less the value of intermediate consumption (intermediate inputs). Gas, electricity and water is a subset of industry (ISIC 40-41). Data are in current local currency.