Gabon vs Guinea: Electricity, gas and water supply, value added

Gabon
105.38 billion current LCU
in 2011
Guinea
124.83 billion current LCU
in 2011
Gabon rank
10th
Guinea rank
9th

Electricity, gas and water supply, value added over time

  • Gabon
  • Guinea
025.0B50.0B75.0B100.0B125.0B197019902011

How they compare

Guinea currently reports 124.83 billion current LCU against 105.38 billion current LCU in Gabon, a difference of 19.45 billion current LCU.

That makes Guinea's figure about 1.2 times Gabon's.

The two have swapped places 5 times across 24 shared years of data; in 1988 it was Gabon ahead.

Gabon ranks 10th and Guinea ranks 9th of 51 countries.

Across the 4 decades both report, Gabon averaged higher in 3 and Guinea in 1.

Head to head by decade

Decade Gabon Guinea Difference Ahead
1980s 33.50 billion current LCU 2.89 billion current LCU 30.61 billion current LCU Gabon
1990s 33.31 billion current LCU 30.01 billion current LCU 3.30 billion current LCU Gabon
2000s 57.39 billion current LCU 57.13 billion current LCU 254.67 million current LCU Gabon
2010s 99.54 billion current LCU 117.30 billion current LCU 17.76 billion current LCU Guinea

Averages of every year both report within each decade.

Frequently asked questions

Which has higher electricity, gas and water supply, value added, Gabon or Guinea?
Guinea, at 124.83 billion current LCU against 105.38 billion current LCU in Gabon as of 2011.
What is the difference in electricity, gas and water supply, value added between Gabon and Guinea?
19.45 billion current LCU, with Guinea ahead.
How many years of comparable data are there for Gabon and Guinea?
24 years are reported by both, from 1988 to 2011.
How do Gabon and Guinea rank globally for electricity, gas and water supply, value added?
Gabon ranks 10th and Guinea ranks 9th of 51 countries.
Where does this data come from?
World Bank national accounts data, and OECD National Accounts data files, published as Electricity, gas and water supply, value added (current LCU). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Gabon vs Guinea: Electricity, gas and water supply, value added. Statizoid, drawing on World Bank national accounts data, and OECD National Accounts data files. Retrieved 02 September 2026, from https://economy.statizoid.com/compare/electricity-gas-and-water-supply-value-added-current-lcu/gabon/guinea/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://economy.statizoid.com/compare/electricity-gas-and-water-supply-value-added-current-lcu/gabon/guinea/">Gabon vs Guinea: Electricity, gas and water supply, value added</a> — Statizoid

About this data

Indicator
Electricity, gas and water supply, value added (current LCU)
Unit
current LCU
Source
World Bank national accounts data, and OECD National Accounts data files
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
51 places, 1,560 data points, 1965–2011
Last refreshed

Value added in gas, electricity and water is defined as the value of output of the ‘Electricity, Gas and Water supply' industry less the value of intermediate consumption (intermediate inputs). Gas, electricity and water is a subset of industry (ISIC 40-41). Data are in current local currency.