Ethiopia vs Tunisia: Electricity, gas and water supply, value added

Ethiopia
5.23 billion current LCU
in 2011
Tunisia
5.75 billion current LCU
in 2011
Ethiopia rank
35th
Tunisia rank
32nd

Electricity, gas and water supply, value added over time

  • Ethiopia
  • Tunisia
02.0B4.0B6.0B196519882011

How they compare

Tunisia currently reports 5.75 billion current LCU against 5.23 billion current LCU in Ethiopia, a difference of 521.59 million current LCU.

That makes Tunisia's figure about 1.1 times Ethiopia's.

The two have swapped places 6 times across 31 shared years of data; in 1981 it was Tunisia ahead.

Ethiopia ranks 35th and Tunisia ranks 32nd of 51 countries.

Across the 4 decades both report, Ethiopia averaged higher in 1 and Tunisia in 3.

Head to head by decade

Decade Ethiopia Tunisia Difference Ahead
1980s 422.83 million current LCU 696.93 million current LCU 274.10 million current LCU Tunisia
1990s 757.22 million current LCU 924.02 million current LCU 166.80 million current LCU Tunisia
2000s 2.45 billion current LCU 2.43 billion current LCU 16.55 million current LCU Ethiopia
2010s 4.81 billion current LCU 5.01 billion current LCU 199.03 million current LCU Tunisia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher electricity, gas and water supply, value added, Ethiopia or Tunisia?
Tunisia, at 5.75 billion current LCU against 5.23 billion current LCU in Ethiopia as of 2011.
What is the difference in electricity, gas and water supply, value added between Ethiopia and Tunisia?
521.59 million current LCU, with Tunisia ahead.
How many years of comparable data are there for Ethiopia and Tunisia?
31 years are reported by both, from 1981 to 2011.
How do Ethiopia and Tunisia rank globally for electricity, gas and water supply, value added?
Ethiopia ranks 35th and Tunisia ranks 32nd of 51 countries.
Where does this data come from?
World Bank national accounts data, and OECD National Accounts data files, published as Electricity, gas and water supply, value added (current LCU). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Ethiopia vs Tunisia: Electricity, gas and water supply, value added. Statizoid, drawing on World Bank national accounts data, and OECD National Accounts data files. Retrieved 07 September 2026, from https://economy.statizoid.com/compare/electricity-gas-and-water-supply-value-added-current-lcu/ethiopia/tunisia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://economy.statizoid.com/compare/electricity-gas-and-water-supply-value-added-current-lcu/ethiopia/tunisia/">Ethiopia vs Tunisia: Electricity, gas and water supply, value added</a> — Statizoid

About this data

Indicator
Electricity, gas and water supply, value added (current LCU)
Unit
current LCU
Source
World Bank national accounts data, and OECD National Accounts data files
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
51 places, 1,560 data points, 1965–2011
Last refreshed

Value added in gas, electricity and water is defined as the value of output of the ‘Electricity, Gas and Water supply' industry less the value of intermediate consumption (intermediate inputs). Gas, electricity and water is a subset of industry (ISIC 40-41). Data are in current local currency.