Congo vs Gabon: Electricity, gas and water supply, value added

Congo
41.85 billion current LCU
in 2011
Gabon
105.38 billion current LCU
in 2011
Congo rank
13th
Gabon rank
10th

Electricity, gas and water supply, value added over time

  • Congo
  • Gabon
025.0B50.0B75.0B100.0B197019902011

How they compare

Gabon currently reports 105.38 billion current LCU against 41.85 billion current LCU in Congo, a difference of 63.53 billion current LCU.

That makes Gabon's figure about 2.5 times Congo's.

Across all 32 years both countries report, Gabon has been ahead every year.

Congo ranks 13th and Gabon ranks 10th of 51 countries.

Gabon has averaged higher in every one of the 4 decades both report.

Head to head by decade

Decade Congo Gabon Difference Ahead
1980s 8.99 billion current LCU 25.82 billion current LCU 16.84 billion current LCU Gabon
1990s 14.23 billion current LCU 33.31 billion current LCU 19.08 billion current LCU Gabon
2000s 22.93 billion current LCU 57.39 billion current LCU 34.45 billion current LCU Gabon
2010s 39.62 billion current LCU 99.54 billion current LCU 59.93 billion current LCU Gabon

Averages of every year both report within each decade.

Frequently asked questions

Which has higher electricity, gas and water supply, value added, Congo or Gabon?
Gabon, at 105.38 billion current LCU against 41.85 billion current LCU in Congo as of 2011.
What is the difference in electricity, gas and water supply, value added between Congo and Gabon?
63.53 billion current LCU, with Gabon ahead.
How many years of comparable data are there for Congo and Gabon?
32 years are reported by both, from 1980 to 2011.
How do Congo and Gabon rank globally for electricity, gas and water supply, value added?
Congo ranks 13th and Gabon ranks 10th of 51 countries.
Where does this data come from?
World Bank national accounts data, and OECD National Accounts data files, published as Electricity, gas and water supply, value added (current LCU). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Congo vs Gabon: Electricity, gas and water supply, value added. Statizoid, drawing on World Bank national accounts data, and OECD National Accounts data files. Retrieved 28 August 2026, from https://economy.statizoid.com/compare/electricity-gas-and-water-supply-value-added-current-lcu/congo-rep/gabon/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://economy.statizoid.com/compare/electricity-gas-and-water-supply-value-added-current-lcu/congo-rep/gabon/">Congo vs Gabon: Electricity, gas and water supply, value added</a> — Statizoid

About this data

Indicator
Electricity, gas and water supply, value added (current LCU)
Unit
current LCU
Source
World Bank national accounts data, and OECD National Accounts data files
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
51 places, 1,560 data points, 1965–2011
Last refreshed

Value added in gas, electricity and water is defined as the value of output of the ‘Electricity, Gas and Water supply' industry less the value of intermediate consumption (intermediate inputs). Gas, electricity and water is a subset of industry (ISIC 40-41). Data are in current local currency.