Cape Verde vs Mozambique: Electricity, gas and water supply, value added

Cape Verde
13.50 billion current LCU
in 2011
Mozambique
11.07 billion current LCU
in 2007
Cape Verde rank
26th
Mozambique rank
28th

Electricity, gas and water supply, value added over time

  • Cape Verde
  • Mozambique
05.0B10.0B15.0B198019952011

How they compare

Cape Verde currently reports 13.50 billion current LCU against 11.07 billion current LCU in Mozambique, a difference of 2.44 billion current LCU.

That makes Cape Verde's figure about 1.2 times Mozambique's.

The two have swapped places 1 time across 18 shared years of data; in 1990 it was Cape Verde ahead.

Cape Verde ranks 26th and Mozambique ranks 28th of 51 countries.

Across the 2 decades both report, Cape Verde averaged higher in 1 and Mozambique in 1.

Head to head by decade

Decade Cape Verde Mozambique Difference Ahead
1990s 3.50 billion current LCU 311.38 million current LCU 3.19 billion current LCU Cape Verde
2000s 5.63 billion current LCU 6.04 billion current LCU 409.62 million current LCU Mozambique

Averages of every year both report within each decade.

Frequently asked questions

Which has higher electricity, gas and water supply, value added, Cape Verde or Mozambique?
Cape Verde, at 13.50 billion current LCU against 11.07 billion current LCU in Mozambique as of 2011.
What is the difference in electricity, gas and water supply, value added between Cape Verde and Mozambique?
2.44 billion current LCU, with Cape Verde ahead.
How many years of comparable data are there for Cape Verde and Mozambique?
18 years are reported by both, from 1990 to 2007.
How do Cape Verde and Mozambique rank globally for electricity, gas and water supply, value added?
Cape Verde ranks 26th and Mozambique ranks 28th of 51 countries.
Where does this data come from?
World Bank national accounts data, and OECD National Accounts data files, published as Electricity, gas and water supply, value added (current LCU). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Cape Verde vs Mozambique: Electricity, gas and water supply, value added. Statizoid, drawing on World Bank national accounts data, and OECD National Accounts data files. Retrieved 07 September 2026, from https://economy.statizoid.com/compare/electricity-gas-and-water-supply-value-added-current-lcu/cabo-verde/mozambique/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://economy.statizoid.com/compare/electricity-gas-and-water-supply-value-added-current-lcu/cabo-verde/mozambique/">Cape Verde vs Mozambique: Electricity, gas and water supply, value added</a> — Statizoid

About this data

Indicator
Electricity, gas and water supply, value added (current LCU)
Unit
current LCU
Source
World Bank national accounts data, and OECD National Accounts data files
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
51 places, 1,560 data points, 1965–2011
Last refreshed

Value added in gas, electricity and water is defined as the value of output of the ‘Electricity, Gas and Water supply' industry less the value of intermediate consumption (intermediate inputs). Gas, electricity and water is a subset of industry (ISIC 40-41). Data are in current local currency.