Gabon vs Guinea: Electricity, gas and water supply, value added

Gabon
81.91 billion constant LCU
in 2011
Guinea
34.82 billion constant LCU
in 2011
Gabon rank
6th
Guinea rank
9th

Electricity, gas and water supply, value added over time

  • Gabon
  • Guinea
20.0B40.0B60.0B80.0B198019952011

How they compare

Gabon currently reports 81.91 billion constant LCU against 34.82 billion constant LCU in Guinea, a difference of 47.09 billion constant LCU.

That makes Gabon's figure about 2.4 times Guinea's.

Across all 24 years both countries report, Gabon has been ahead every year.

Gabon ranks 6th and Guinea ranks 9th of 44 countries.

Gabon has averaged higher in every one of the 4 decades both report.

Head to head by decade

Decade Gabon Guinea Difference Ahead
1980s 33.05 billion constant LCU 19.30 billion constant LCU 13.75 billion constant LCU Gabon
1990s 33.54 billion constant LCU 23.44 billion constant LCU 10.10 billion constant LCU Gabon
2000s 54.95 billion constant LCU 31.81 billion constant LCU 23.13 billion constant LCU Gabon
2010s 78.02 billion constant LCU 35.63 billion constant LCU 42.39 billion constant LCU Gabon

Averages of every year both report within each decade.

Frequently asked questions

Which has higher electricity, gas and water supply, value added, Gabon or Guinea?
Gabon, at 81.91 billion constant LCU against 34.82 billion constant LCU in Guinea as of 2011.
What is the difference in electricity, gas and water supply, value added between Gabon and Guinea?
47.09 billion constant LCU, with Gabon ahead.
How many years of comparable data are there for Gabon and Guinea?
24 years are reported by both, from 1988 to 2011.
How do Gabon and Guinea rank globally for electricity, gas and water supply, value added?
Gabon ranks 6th and Guinea ranks 9th of 44 countries.
Where does this data come from?
World Bank national accounts data, and OECD National Accounts data files, published as Electricity, gas and water supply, value added (constant LCU). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Gabon vs Guinea: Electricity, gas and water supply, value added. Statizoid, drawing on World Bank national accounts data, and OECD National Accounts data files. Retrieved 06 September 2026, from https://economy.statizoid.com/compare/electricity-gas-and-water-supply-value-added-constant-lcu/gabon/guinea/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://economy.statizoid.com/compare/electricity-gas-and-water-supply-value-added-constant-lcu/gabon/guinea/">Gabon vs Guinea: Electricity, gas and water supply, value added</a> — Statizoid

About this data

Indicator
Electricity, gas and water supply, value added (constant LCU)
Unit
constant LCU
Source
World Bank national accounts data, and OECD National Accounts data files
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
44 places, 1,184 data points, 1965–2011
Last refreshed

Value added in gas, electricity and water is defined as the value of output of the ‘Electricity, Gas and Water supply' industry less the value of intermediate consumption (intermediate inputs). Gas, electricity and water is a subset of industry (ISIC 40-41). Data are in constant local currency.